In Part Five/Week Five of our 8 week transformation series on our '65 C10, we're laying down the infrastructure that will get our 5.3 LS ready to run. This week we build our Flowmaster Exhaust, wire our engine with our Holley Terminator Max and get our driveshaft sized up among other things.