Skip to main content
ASK OUR EXPERTS
1-866-464-6553
Report

The Plan

By: Lkn4luv 11/03/2022
6DF620D9-9E4A-4313-BD5C-9744BA0071E7.jpeg

Parts were ordered and plans were made. Goal was to lay the frame on the ground with air bags and 18” Intro wheels. AirLift 3H would control the chaos with sensors at all four corners. First show i went to ot was shot for Street Trucks for their Blood sweat sbd tears section. Very cool day!!

47A60445-B0A4-4956-B608-0623A06A228E.jpeg
32C90CAC-2FCE-4C69-AFE9-EB2296900BB2.jpeg
EAFDAB2C-274D-4B2B-95AA-CF516E61FA15.jpeg


Back to Ride