Skip to main content
ASK OUR EXPERTS
1-866-464-6553
Report

Beast Update

By: Hoop 03/06/2021

It's been awhile. Alot has been going on here. New updates to the car now includes the following.


1. Battery relocation to the trunk. ( works great I have reinforced grounds and larger cables.)


2. Flipped the fuseboxes under the car. ( Really cleans up the engine bay.)


3. Rerouted the engine bay wires out of site and removed any unnecessary wires.


4. Preformed an A/C delete.


5. Painted the engine bay with ( Black Raptor liner) made covers to fit the battery side and fusebox side really cleans up the engine bay.


6. Preformed all the necessary trimming for a vertical radiator. ( Ready for install.)


7. Removed and replaced dashboard. Cleaned up all unnecessary wires. Removed airbag on passenger side provides more room for terminator X Install. ( Air bag system was no longer operational so you have a possible problem in the future.)


8. Currently waiting on new carpet and various items to be ordered


Well thanks for the log winded post.. more to come.



Back to Ride